AC Installation / Uninstallation
AC installation / uninstallation covers only the selected scope. Parts and additional repair work require customer approval.
What is included
- Installation or uninstallation labour for the selected ac option at an existing compatible point
- Basic safety and functional check after the selected work where possible
- Estimate discussion before any part replacement or additional repair
- Completion proof or OTP where required
What is not included
- Gas, capacitor, PCB, motor, sensor, remote, copper pipe, drain pipe, stand, or wire unless explicitly listed
- Core cutting, welding, electrical line changes, or unsafe-height outdoor-unit work
- Warranty on old parts, customer-provided parts, or pre-existing physical damage
- Work outside the selected appliance and option
Before the visit
- Keep both indoor and outdoor units safely accessible and share AC type, tonnage, and symptoms.
- Confirm part price, extra labour, and warranty before approving replacement.
Common questions
Are spare parts included?
No. Parts and additional repair work are quoted separately unless the selected option clearly includes them.
What is included in this ac booking?
Only the selected installation / uninstallation scope and the listed labour are included. Any additional fault or work is confirmed before starting.
Before booking
Select your service city or address to confirm current availability, scope and price.